WHAT IS THE COST OF A BATHROOM REMODEL?

LARGER MASTER BATH
TYPICAL HALL BATH
POWDER ROOM

LARGER MASTER BATHROOM

On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.

TYPICALLY MOST PROJECTS LAND BETWEEN MID & UPPER LEVELS

BASIC-LEVEL

$35K+
  • Replace Existing Tub & Shower Base with New Fiberglass Tub & Shower Base (Keep Existing Sizes & Locations)
  • Porcelain Tile Floor & Shower Walls
  • Level 2 Plumbing Fixtures
  • Level 2 Vanity Cabinetry
  • Granite/Quartz Remnant Top
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Fixtures Remain in the Same Locations

MID-LEVEL

$42K+
  • Remove Existing Tub & Shower. Expand Existing Shower with Mudbase Tile Shower (Tub is Not Included)
  • Porcelain Tile Floor, Shower Base & Walls
  • Level 3 Plumbing Fixtures
  • Level 3 Vanity Cabinetry
  • Granite/Quartz Remnant Top & Shower Pieces
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Limited Fixture Movement

UPPER-LEVEL

$50K+
  • Remove Existing Tub & Shower. Install New Tub, Expanded Mudbase Tile Shower with Seat
  • Natural Stone Floor, Shower Base & Walls
  • Level 4 Plumbing Fixtures
  • Level 3 Vanity Cabintry w/Linen Cabinet
  • Granite/Quartz Remnant Top & Shower Pieces
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Fixtures May be Moved

INCLUDED:  Space Planning and Layout Design with Our Designer, a Dedicated Project Manager, and All Labor & Materials. Access to our Customer Portal Where You Can Monitor Progress and Design Selections Via Your Phone and Computer.

NOT INCLUDED: Adding Egress Windows, Upstairs Smoke Detectors (Code Requirement), or Permit Fees. Caution, Flooring Upgrades Such as Hardwood, Tile, & Linoleum Can Accelerate the Cost Significantly.

TYPICAL HALL BATH (5′ x 8′)

On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.

TYPICALLY MOST PROJECTS LAND BETWEEN MID & UPPER LEVELS

BASIC-LEVEL

$18K+
  • Keep Existing Tub
  • Ceramic Tile Floor & Shower Walls
  • Level 1 Plumbing Fixtures
  • Level 1 Vanity Cabinetry
  • Level 1 Granite Remnant Top
  • Electrical Updates
  • Shower Door NOT Included
  • Fixtures Remain in the Same Locations

MID-LEVEL

$22K+
  • Replace Existing Tub with Tub or Fiberglass Shower Base
  • Porcelain Tile Floor & Shower Walls
  • Level 2 Plumbing Fixtures
  • Level 2 Vanity Cabinetry
  • Granite/Quartz Remant Top
  • Electrical Changes/Updates
  • Shower Door NOT Included
  • Fixtures Remain in the Same Locations

UPPER-LEVEL

$26K+
  • Remove Tub & Replace with Tile Base Shower
  • Porcelain or Natural Stone Tile Floor & Shower
  • Level 3 Plumbing Fixtures
  • Level 3 Vanity Cabinetry
  • Granite/Quartz Remnant Top & Shower Pieces
  • Electrical Changes/Updates
  • Custom Shower Doors
  • Fixtures May Be Moved

INCLUDED:  Space Planning and Layout Design with Our Designer, a Dedicated Project Manager, and All Labor & Materials. Access to our Customer Portal Where You Can Monitor Progress and Design Selections Via Your Phone and Computer.

NOT INCLUDED: Adding Egress Windows, Upstairs Smoke Detectors (Code Requirement), or Permit Fees. Caution, Flooring Upgrades Such as Hardwood, Tile, & Linoleum Can Accelerate the Cost Significantly.

POWDER ROOM

We currently do not have pricing available for powder rooms and half baths.

Click here to go back to the top.